
Flat roof replacement in SE16, London
Flat roof replacement in SE16, London: stripped to the rafters, rafters strengthened, new plywood deck and three layer torch-on felt in 2 days.
Get your free roof quote
What needs sorting?
Free, no-obligation quote. Workmanship guaranteed. Fully insured.
Free quotes. Fully insured. Open 7 days.
Checkatrade 10/10 from 10 reviews · Registered company 17330173
The old flat roof on this property in London SE16 had failed. Rather than patch a covering that had reached the end of its life, we stripped it right back to the rafters, strengthened every rafter, fixed a new plywood deck and finished the roof with a three layer torch-on felt system. The photographs below were taken by our team on site and follow the job from the bare timbers to the finished mineral felt. The work was completed on 4 November 2026, with a 2 day turnaround.
| Job | Flat roof replacement |
|---|---|
| Area | London, SE16 |
| Problem | Old flat roof failed |
| Work done | Stripped to the rafters, all rafters strengthened, new plywood deck, three layer torch-on felt system |
| Materials | Torch-on mineral felt |
| Turnaround | 2 days |
| Completed | 4 November 2026 |
The old flat roof stripped off
With the failed covering and the old deck removed, the roof timbers were open to view. Stripping back this far is the only way to see every rafter and to build the new roof on a sound base.

Strengthening the rafters
One of our roofers working along the roof as the structural work goes in. Every rafter was strengthened, so the new deck has a firm, even frame to sit on.

Structural work complete
The strengthened timber frame ready for the new deck, with the soil pipe and its fittings still in place along the edge of the roof.

A new plywood deck
New plywood boards fixed across the strengthened rafters. The felt system is bonded to this deck, so it has to be fixed firmly and laid flat, without gaps or steps between the boards.

The deck boarded out
The whole roof boarded out in new plywood, from the wall to the edge, ready for the felt.

Boarding round the pipework
The new plywood is cut neatly round the soil pipe and its brackets, so the felt can be dressed round them and sealed.

The underlay torched down
The underlay of the three layer torch-on felt system laid over the new plywood. Each layer is bonded down with the torch and lapped over the one before.

The finished roof
The finished roof in torch-on mineral felt. The mineral top layer protects the felt beneath it from sunlight and weather.

Discuss your roofing work
If your flat roof is leaking, ponding or has been patched more than once, call Primefix Roofing & Guttering Ltd. We will inspect it, explain whether a repair or a new flat roof is the right answer, and give you a free, no-obligation quote. New roofs carry a 25-year guarantee and repairs carry a 10-year guarantee.
Your roof. A clear next step.
Tell us what is happening and where. You get a free, no-obligation quote and a written price before anything starts.
Open Monday to Sunday, 9am to 5pm
Free quotes. Fully insured. Workmanship guaranteed.
Tell us what your roof needs
We will call you back to arrange your free roof quote. No obligation.
